Switch Site Location in 

 Cleveland, Ohio

815 Superior Ave.

Request a Quote

Schedule a Tour

MSP AFFINITY PROGRAM

NETWORK PROVIDERS and CLEC AFFINITY PROGRAM

}

The MSP Affinity Program is a perfect way for your company to provide an end-to-end solution to address your clients’ data center needs. Place your clients here in one of our data centers and enjoy the following:

 

  • Predictable cost structure.

  • No hidden fees.

  • No access fees.

  • No cross connect fees.

  • You choose your network provider or providers.

  • You will be given 24-hour access 7 days a week to provide the necessary attention to your client’s gear.

  • The more gear you place in our center, the cheaper your rent is for all the gear in our centers.

 

We handle all real estate requirements of the data center including HVAC, heat rejection, security and electricity. 

For more information, please contact E. V. Bishoff Company, 614-221-4736.

Second Floor 

Network Switch Site

The second floor data center includes the following:

  • All cooling, generation and power

  • Raised floors

  • Caged Areas

  • Generator

  • Handsome office 

  • Conference room

This Data Center Switch Site
is turn-key

  • 24/7/365 access

  • Complimentary cross Connects

  • 12,000 s.f. Can be expanded
    to 24,000 s.f.

  • Can be divided as well

Power and Connectivity

E.V. Bishoff Company specializes in leasing data center space in downtown Cleveland! The Cleveland network switch site is unmatched in offering a

one-stop, secure, and cost-effective network switch site space to meet your needs!

About The Second Floor Network Switch Site

 Site Location: 815 Superior Ave, Cleveland, Ohio (Next to the Federal Reserve)

Municipality: Cleveland

Building Profile: 22 story office building located next to the Federal Reserve. The Data Center floor is a part of the building.

Exterior: Brick and Concrete

Heat Rejection: N X 2 in pack

Security: 24x7x365 key card access to building, to elevator and to floor, bio-metric and video monitored access.

Fire Protection: The building is protected by an electronic smoke system that is tied directly to the Fire department with a PreAct dry water system tied to a three alarm system

 

Power Distribution: Power distribution will be at 480 volts.

Electric Transformers: two transformers supported by an automated switch.

Generator: In place. Tested and maintained

Nearest Substation: CPP Lake Road Substation

Location: City Center

Floor Loading: 100-125 lbs per square foot

Parking: Across Rockwell Ave & on street metered

Fees/Cross Connects: None

Elevators: Five state of the art elevators.

Floor Size: 13,000 s.f. (divisible)

Network: Best connected building in Cleveland. Multiple network carrier’s onsite.

Power: Cleveland Power, with diverse connections to three power substations currently delivers 4,000 amps of load

A Look Inside The Second Floor

Network Switch Site

Other Data Center Options

Fifth Floor Build-to-Suit Data Center

Or Network Switch Site & Expansion