Cleveland Data Center
& Switch Space

5th Floor

815 Superior Ave
Cleveland, OH 44114

About

Power and Cooling Infrastructure:

  • Landlord to install generator

  • Power distribution will be at 480 volts

  • Heat rejection: 100 tons on site

  • Smoke detector connected to fire department with FM 200

  • Diverse connections to three power substations

  • Currently delivers 4,000 amps of load

  • Two transformers supported by an automated switch

  • Nearest substation: CPP Lake Road Substation
     

Basic Security Measures:

  • 24/7 key card access to ground floor and elevator

  • Security cameras
     

Utility Connections:

  • Great network connection w/ multiple network carrier's on site

​

Scalability:

  • Tenants can scale their IT infrastructure within the provided shell as their needs evolve, without the constraints of building new infrastructure.

​

Let Us Help You

Structural Integrity:

  • Exterior is brick and concrete

  • Floor loading at 100-125 lbs/sqft

​

Customization Potential:

  • 13,000 sqft divisible floor

​

Reduced Construction Time:

  • Foundational infrastructure is already in place
     

Cost Efficiency:

  • The upfront infrastructure investment is shared among multiple tenants, making it potentially more cost-effective than constructing an entire data center facility.